Our Projects

Pioneering marine construction excellence across the globe

Electrical Service

King Fahd Industrial Port Berth 54

Duration: June 2004 – September 2004

Contractor: Huta Hegerfeld Saudia Ltd
Client: Royal Commission
Supervision: Saudi Bechtel
Scope: Cable pulling, termination & testing of 4.16 kV MV cables and 6" RGS conduits from Berth 53 to Berth 54

Electrical Service

Durrat Al Khobar

Duration: 2005

Contractor: Huta Hegerfeld Saudia Ltd
Consultant: ACEC
Scope:

  • Installation of street lighting poles

  • Cable pulling in Zone A & Zone C

  • LV cable pulling from package substations to feeder pillars (Zone A)

Marine Infrastructure

Petrorabigh – Sumitomo JV (Liquid Berth 5)

Duration: 2006 – 2007

Contractor: Techint
PMC: Foster Wheeler
Scope:

  • Lighting, conduiting, cable pulling & testing

  • I&C JB installation and cable termination

  • Impulse tubing and instrument works

  • Fabrication & installation of stanchions

  • PLC panels, local panels, hydraulic tubing & IS cable installation

Electrical Service

King Fahd Industrial Port – Yanbu (Berth 20 Construction)

Duration: 2008 – 2009

Contractor: Huta Marine Works
Client: Royal Commission / Saudi Ports Authority
Supervision: ACEC
Scope: Installation and testing of sacrificial anode cathodic protection system for steel tubular piles

Electrical Service

Thuwal Town Development – KAUST Sports Marina

Duration: 2010 – 2011

Contractor: SBG ABCD / Huta Marine
Client: KAUST / Saudi Aramco

Electrical Service

King Abdullah Economic City KAEC

Duration: 2010

Contractor: Huta Hegerfeld Saudia Ltd
Client: KAEC / Emaar
Scope: Cathodic protection of viewing platform steel piles

Electrical Service

 1320 MW SEPCO 3 IPP Rabigh

Duration: 2010 – 2012

Contractor: SEPCO-3
Client: ACWA Power
Scope:

  • Firefighting works at oil unloading jetty

  • Lighting installation for access trestle & jetty

  • Cable tray installation in marine area

  • Low-voltage power distribution

Electrical Service

Recreation Berth – Yanbu Commercial Port

Duration: 2011 – 2012

Client: Saudi Ports Authority
Consultant: Zuhair Fayez Partnership
Contractor: Huta Hegerfeld Saudia Ltd
Scope: MEP Works

Electrical Service

Supporting Berth – Yanbu Commercial Port

Duration: 2012 – 2013

Client: Saudi Ports Authority
Consultant: ACEC
Contractor: Huta Marine Works Ltd
Scope: MEP Works

Electrical Service

Construction of Berths 8 & 9 – Yanbu Commercial Port

Duration: 2012 – 2013

Client: Saudi Ports Authority
Consultant: ACEC
Contractor: PC Marine
Scope: MEP Works

Electrical Service

Jeddah South Thermal Power Plant (JSTPP)

Duration: 2013 – 2014

Owner: Saudi Electricity Company
Client: Hyundai Heavy Industries
Consultant: Lahmeyer International
Scope: Installation of marine loading arms

Electrical Service

Shuqaiq Steam Power Plant (SSPP)

Duration: 2013 – 2014

Owner: Saudi Electricity Company
Client: Hyundai Heavy Industries
Consultant: PÖYRY
Scope: Marine loading arms installation and jetty topside MEP works

Electrical Service

King Abdullah Port (KAP) – Phase 1

Duration: 2014 – 2017

Developer: Port Development Company
Client: Huta Marine Works
Consultant: AECOM
Scope: MEP Works

Electrical Service

Sharma MOD Jetty

Duration: 2016 – 2017

Client: Ministry of Defense
Contractor: SBG
Consultant: Saudi Diyar
Scope: MEP Works

Electrical Service

Baish Corniche Development – Baish Marina

Duration: 2017 – 2018

Contractor: Firstfix
Client: Saudi Aramco
Scope:

  • Pontoon & pedestal installation
  • Cable laying & pump-out systems
  • Fuel tanks, piping & dispenser installation

Electrical Service

Replacement of Berth No. 4 Loading Arms – Petrorabigh

Duration: 2019 – 2020

Client: Petrorabigh
Supervision: FMC Technip
Scope: Replacement of marine loading arms

Electrical Service

Red Sea Village North Obhur – Infrastructure Package

Duration: 2020 – 2021

Developer: Al Thuraya Development Company
Consultant: ACEC
Contractor: China Communications Construction Co. (CCCC)
Scope: MEP Works

Electrical Service

Red Sea Village (RSV)

Duration: 2021 – 2022

Developer: Al Thuraya Development Company
Consultant: ACEC
Contractor: Thabat Contracting Co.
Scope: Street lighting and MEP works

Electrical Service

Jeddah Yacht Club – F1 Marina (JYC)

Duration: 2021 – 2023

Client / Supervision: SELA
Contractor: Modern Building Leaders Co. (MBL)
Scope:

  • Onshore & offshore marine infrastructure
  • Pontoons and backyard MEP works

Electrical Service

Jeddah Central Development (JCD) – Marine Infrastructure Package

Duration: 2023 – 2025

Developer: Jeddah Central Development Company
Contractor: Modern Building Leaders Co. (MBL)
Scope:

  • Quay wall & pontoon MEP

  • Fuel station, firefighting, potable water

  • Storm drainage, sewage

  • LV systems, frequency converters

  • Lighting and security gates

Electrical Service

Kempinski Resort – Yanbu

Duration: 2025 – 2026

  • Scope: Beach slope & contour creation, groyne construction

Electrical Service

Amaala Marina – Umluj

Duration: 2025

Client: Red Sea Global (RSG)
Contractor: China Harbour / SAMACO
Scope: Pedestal installation and utilities distribution on pontoons & quay walls