Our Projects
Pioneering marine construction excellence across the globe
Electrical Service
King Fahd Industrial Port Berth 54
Duration: June 2004 – September 2004
Contractor: Huta Hegerfeld Saudia Ltd
Client: Royal Commission
Supervision: Saudi Bechtel
Scope: Cable pulling, termination & testing of 4.16 kV MV cables and 6" RGS conduits from Berth 53 to Berth 54
Electrical Service
Durrat Al Khobar
Duration: 2005
Contractor: Huta Hegerfeld Saudia Ltd
Consultant: ACEC
Scope:
-
Installation of street lighting poles
-
Cable pulling in Zone A & Zone C
-
LV cable pulling from package substations to feeder pillars (Zone A)
Marine Infrastructure
Petrorabigh – Sumitomo JV (Liquid Berth 5)
Duration: 2006 – 2007
Contractor: Techint
PMC: Foster Wheeler
Scope:
-
Lighting, conduiting, cable pulling & testing
-
I&C JB installation and cable termination
-
Impulse tubing and instrument works
-
Fabrication & installation of stanchions
-
PLC panels, local panels, hydraulic tubing & IS cable installation
Electrical Service
King Fahd Industrial Port – Yanbu (Berth 20 Construction)
Duration: 2008 – 2009
Contractor: Huta Marine Works
Client: Royal Commission / Saudi Ports Authority
Supervision: ACEC
Scope: Installation and testing of sacrificial anode cathodic protection system for steel tubular piles
Electrical Service
Thuwal Town Development – KAUST Sports Marina
Duration: 2010 – 2011
Contractor: SBG ABCD / Huta Marine
Client: KAUST / Saudi Aramco
Electrical Service
King Abdullah Economic City KAEC
Duration: 2010
Contractor: Huta Hegerfeld Saudia Ltd
Client: KAEC / Emaar
Scope: Cathodic protection of viewing platform steel piles
Electrical Service
1320 MW SEPCO 3 IPP Rabigh
Duration: 2010 – 2012
Contractor: SEPCO-3
Client: ACWA Power
Scope:
-
Firefighting works at oil unloading jetty
-
Lighting installation for access trestle & jetty
-
Cable tray installation in marine area
-
Low-voltage power distribution
Electrical Service
Recreation Berth – Yanbu Commercial Port
Duration: 2011 – 2012
Client: Saudi Ports Authority
Consultant: Zuhair Fayez Partnership
Contractor: Huta Hegerfeld Saudia Ltd
Scope: MEP Works
Electrical Service
Supporting Berth – Yanbu Commercial Port
Duration: 2012 – 2013
Client: Saudi Ports Authority
Consultant: ACEC
Contractor: Huta Marine Works Ltd
Scope: MEP Works
Electrical Service
Construction of Berths 8 & 9 – Yanbu Commercial Port
Duration: 2012 – 2013
Client: Saudi Ports Authority
Consultant: ACEC
Contractor: PC Marine
Scope: MEP Works
Electrical Service
Jeddah South Thermal Power Plant (JSTPP)
Duration: 2013 – 2014
Owner: Saudi Electricity Company
Client: Hyundai Heavy Industries
Consultant: Lahmeyer International
Scope: Installation of marine loading arms
Electrical Service
Shuqaiq Steam Power Plant (SSPP)
Duration: 2013 – 2014
Owner: Saudi Electricity Company
Client: Hyundai Heavy Industries
Consultant: PÖYRY
Scope: Marine loading arms installation and jetty topside MEP works
Electrical Service
King Abdullah Port (KAP) – Phase 1
Duration: 2014 – 2017
Developer: Port Development Company
Client: Huta Marine Works
Consultant: AECOM
Scope: MEP Works
Electrical Service
Sharma MOD Jetty
Duration: 2016 – 2017
Client: Ministry of Defense
Contractor: SBG
Consultant: Saudi Diyar
Scope: MEP Works
Electrical Service
Baish Corniche Development – Baish Marina
Duration: 2017 – 2018
Contractor: Firstfix
Client: Saudi Aramco
Scope:
- Pontoon & pedestal installation
- Cable laying & pump-out systems
- Fuel tanks, piping & dispenser installation
Electrical Service
Replacement of Berth No. 4 Loading Arms – Petrorabigh
Duration: 2019 – 2020
Client: Petrorabigh
Supervision: FMC Technip
Scope: Replacement of marine loading arms
Electrical Service
Red Sea Village North Obhur – Infrastructure Package
Duration: 2020 – 2021
Developer: Al Thuraya Development Company
Consultant: ACEC
Contractor: China Communications Construction Co. (CCCC)
Scope: MEP Works
Electrical Service
Red Sea Village (RSV)
Duration: 2021 – 2022
Developer: Al Thuraya Development Company
Consultant: ACEC
Contractor: Thabat Contracting Co.
Scope: Street lighting and MEP works
Electrical Service
Jeddah Yacht Club – F1 Marina (JYC)
Duration: 2021 – 2023
Client / Supervision: SELA
Contractor: Modern Building Leaders Co. (MBL)
Scope:
- Onshore & offshore marine infrastructure
- Pontoons and backyard MEP works
Electrical Service
Jeddah Central Development (JCD) – Marine Infrastructure Package
Duration: 2023 – 2025
Developer: Jeddah Central Development Company
Contractor: Modern Building Leaders Co. (MBL)
Scope:
-
Quay wall & pontoon MEP
-
Fuel station, firefighting, potable water
-
Storm drainage, sewage
-
LV systems, frequency converters
-
Lighting and security gates
Electrical Service
Kempinski Resort – Yanbu
Duration: 2025 – 2026
-
Scope: Beach slope & contour creation, groyne construction
Electrical Service
Amaala Marina – Umluj
Duration: 2025
Client: Red Sea Global (RSG)
Contractor: China Harbour / SAMACO
Scope: Pedestal installation and utilities distribution on pontoons & quay walls